CEMENT CARRIER OPEN FOR CHARTER-FAR EAST

CEMENT CARRIER OPEN FAR EAST FOR CHARTER

Open South Korea Mid Jan dates
 
 MV NACC COZUMEL
S. Deadweight: abt 8,400 mtons
S. Draft: abt 6.80m
Built in 2009 by Shandong Hunghai Shipbuilding, China
Classification Society: Bureau Veritas
Loa: 117.00m
Breadth: 19.7 m
TPC on S. Draft: 19.2 mtons
GT/NT: 5652/2687
 
LOADING:
1.        Mechanically (by gravity), through centerline loading inlet
(and 180 m3/min transport rate): up to 500 tons per hour
2.        Pneumatically, through pipeline from shore: up to 2 x 200
tons per hour (400 t/h total)
 
UNLOADING:
1.        Pneumatically, through pipelines to shore facilities:
Unloading rate: up to 2 x 250 tons per hour (500 t/h total)
2.        Mechanically, via bulk chute boom (not for trucks):
Unloading rate: up to 300 tons per hour

LIM