Deep-Submersible Offshore Wind Power Installation Platform

Deep-Submersible Offshore Wind Power Installation Platform for sale

Direct from our close Owners we have below unit for sale

Deep-Submersible Offshore Wind Power Installation Platform

Built: Nov 2021

Classification: CCS

Class Notation: CSA, Submersible, Offshore Wind Turbine Service Unit, Crane Unit, Lifting Appliance, IWS
Pontoon: 81.8 × 81.8 m octagonal structure with ballast tanks and 8 positioning anchors

Columns: 4 heavy-duty columns with multiple tank arrangements and vertical access

Deckbox: 81.8 × 86.9 m upper deck providing large open assembly space

Cylindrical Buoys: 8 additional cylinders enhancing stability during submerging and lifting operations
Minimum Transit Draft: 9.20 m
Maximum Transit Draft: 11.60 m

Maximum Working Draft (Bottom Sitting): 52.00 m

Accommodation: 118 persons

Endurance: 40 days
Cargo Deck Load: 5 t/m²
Wind Blade Assembly Area: 10 t/m²

Large open deck space suitable for turbine blade, tower, or nacelle assembly
Cranes and Lifting Equipment

600T Full-Swing Crane

Max Capacity: 600T, Auxiliary: 120T

Lifting Height: 122 m

Reserved interface for future 2500T crane installation
300T Full-Swing Crane

Max Capacity: 300T, Auxiliary: 40T

Suitable for secondary lifting and turbine maintenance tasks
Mooring and Positioning

8-point mooring system with mechanical winches and load-sensing fairleads

Delta HHP Anchors: 8 units, 22.5 tons each

Operational Limits:

Wind ≤ 13.8 m/s

Current ≤ 2 knots

Significant wave height Hs ≤ 1.5 m

Ensures precise positioning during installation and bottom-sitting operations
Marine and Safety Systems

Firefighting: 50 hydrants, CO2, foam, and dry powder systems, fully SOLAS-compliant

Life-saving Appliances:

2 × 120-person lifeboats

1 rescue boat

4 life raft stations

Main Generators: 4 × 1500 kW (690V)

Harbor Generator: 800 kW (400V)

Emergency Generator: 800 kW (1000 kVA)

Power Management System (PMS) for optimized load distribution

Supports high electrical demand during crane operations and ballasting sequences
Ballast and Bilge Systems

32 ballast tanks with automated air ballast system

Submerging time: approximately 2 hours

Lifting time: approximately 7 hours

IMO-compliant oily water separation and bilge management system

Key Highlights

Designed for offshore wind turbine installation and maintenance
600T full-swing crane with reserved interface for 2500T crane upgrade
118-person accommodation and 40-day endurance
8-point mooring system with high-precision positioning
Robust submersible design enabling bottom-sitting operations up to 52 m

————————————————————–

ADA WOG

Current Availability

The platform is currently located at in Guangxi, south west China and is open for on-site inspection by interested parties.