TWO FULLY IMO2 (18 TANKS) MR TANKER BUILT 2017 GSI CHINA
DEADLINE FOR OFFERS MARCH 25TH GMT BASIS
C/FREE DELY UK/CONT/MED (LIKELY ARA RGE)
Atlantic Delivery 21 April / 22 May
Pacific Delivery 25 May / 26 June
ATLANTIC + PACIFIC Scandinavian flag – Full IMO 2 – 18 Tanks Built: 2017 GSI China 49,650 Dwt on 12.90 M Class: LR IMO 2 – X100A1, Double Hull Oil and Chemical Tanker ESP, SHIPRIGHT (CM, ACS (8)), CSR, LI, IWS, SPM4, LMC, UMS, NAV1, ECO (BWT, EEDl-2, IHM) Descriptive Note: SHIPRIGHT (VECS, SCM) NEXT SS/DD 12/2027 LOA: 183.21 m Beam: 32.26 m Depth: 18.20 m 9 full cargo segregations in 16 cargo tanks (8 pairs), 2 slop tanks and 1 residual – Tank Cap 52,363 CBM Phenolic Epoxy & Nitrogen Inert gas plant. 18 FRAMO Pumps 375 CBM/HR each. Cargo lines SST Nitrogen Generator for full discharge capacity Cargo Heating with Primary Steam and Secondary hot water system M/E MAN-B+W 6S50ME-B9 – 9,882BHP IMO and USCG type approved BWTS plant (for salt and brackish water) – ada and wog –
Itineraries for inspections:
ATLANTIC
Pasir Gudang 16 March 2023 – Singapore 18 March
– Suez 03 April – Amsterdam 14/04/2023 – ETC 22/04/2023